VashonBePrepared Weekly Newsletter

Newsletter #162 Friday, December 20, 2024(full newsletter)

‘Tis the Season of Millions of Batteries
Lithium-Ion Batteries Can Catch Fire and Even Explode
Your Quick Checklist for Battery Safety

Esta es la Epoca de uso de Millones de Baterias
Las Baterias de Litio pueden Encenderse y hasta Explotar
Lista de Seguridad para el Uso de Baterias

GetPrepared
COVID Vaccine

Learn about the many ways you can prepare for disasters at home or at your business.

Get Alerts
...

Sign up for Voice of Vashon's emergency alerts, VashonBePrepared's weekly newsletter, and other regional alerts.

About Us
...

VashonBePrepared is a coalition of some 10 disaster preparedness organizations on Vashon-Maury Island in Washington's Puget Sound region. We work closely with local and county organizations.

I Want to Help Out

VashonBePrepared provides training and educational opportunities to keep the island community prepared for the next emergency.

Latest Updates

Chile Recovers From 2010 M8.8 Earthquake

Feb 8

Written by:
2/8/2011 7:27 PM  RssIcon

Bellevue’s MRP Engineering has a new engineering bulletin entitled Chile Recovers From 2010 M8.8 Earthquake that looks at progress made since their M8.8 earthquake February 27th, 2010. It concludes with these implications:

Chile is making headway in rebuilding its heartland following a massive subduction zone earthquake that
affected modern structures as far away as Santiago (335 km from the epicenter). However, the recovery from
a major earthquake need not be a lengthy process. Organizations with earthquake exposures can learn from
this event and should consider proactive steps to enhance safety, reduce damage, and minimize downtime.
• Review business recovery plans to include dedicated resources (contactors, suppliers, and engineers).
• For existing operations, assess earthquake risks (buildings, contents, and critical lifelines) and identify
specific areas of improvement relative to safety and business risks.
• For proposed construction, perform independent design reviews to verify the desired seismic
performance. Building codes tend to focus on occupant safety rather than limiting damage in a major
earthquake.
• Verify seismic restraint of equipment and contents. This is a cost-effective method of loss control.

Tags: Chile , Earthquakes , Study
Categories:
Location: Blogs Parent Separator John's Blog
bflix